WELTEX – is a leading telecom and security systems infrastructure provider offering complete or specialized services in the building of fixed or mobile networks.
List of Horizontal Directional Drilling (HDD) Works – Ongoing Projects
We have built up extensive experience in the areas of civil works, particularly trenchless technology such as horizontal directional drilling (HDD) and mole ploughing; cable installation, such as fibre optic cable blowing, splicing and testing; Dark fibre services, such as maximizing the utilization of spare network; Asset identification; such as the testing, location and recording of existing network.
Here is the list of few ongoing HDD projects:
No. | Project Name | Client (Main Contractor) | Cosnt. Period Completion date (Done or expected) | Status | Prime / Subcontractor |
---|---|---|---|---|---|
1 | HDD works 380KV SEC MBS2 Project Contract # 15130 | SEC (Subcontractor for TDP) | 2023 | Ongoing | Subcontractor |
2 | HDD works for 13.8KV SEC Projects in Riyadh | SEC COA / Hadi Ben Shuja Contracting Co. | 2023 | Ongoing | Subcontractor |
3 | HDD works for 13.8KV SEC Projects in Riyadh & Dammam | SEC COA & SEC EOA / Al Janahain Contracting Co. | 2023 | Ongoing | Subcontractor |
4 | HDD works for 13.8KV SEC Project multiple locations in Riyadh | SEC COA / Infrastructure Horizons Contracting Co. | 2023 | Ongoing | Subcontractor |
5 | HDD works for SEC UNIFIED CONTRACT AL HASSA - Phase 2 | SEC EOA / ASAMCO | 2023 | Ongoing | Subcontractor |
6 | HDD works for 13.8KV SEC Project in Al Khafji | SEC EOA / Al Jalhami | 2023 | Ongoing | Subcontractor |
7 | HDD Works for SGTP (SOUTH GHAWAR UR - TRANSMISSION PIPELINES) BI-10-14331-0003, CONTRACT | SAUDI ARAMCO / CAT International Co. | 2023 | Ongoing | Subcontractor |
8 | HDD works for Power Reliability Enhancement Project in Haradh, Saudi Aramco Project | SAUDI ARAMCO / ANABEEB | 2023 | Ongoing | Subcontractor |
9 | HDD works for Riyadh Green Project | Royal Commission Riyadh / Nabatat Co. | 2023 | Ongoing | Subcontractor |
10 | HDD works at Pivot 29 Between Al Jouf 1-7 & 8-12, Tabarjal, Al Jouf | Al Marai Co. | 2023 | Ongoing | Subcontractor |
FOC & DAS – Ongoing Projects
Distributed Acoustic Sensing (DAS) are fibre optic based Opto-electronic instrument which measure acoustic interference along the length of a fibre optic sensing cable detect Third Party intrusion (vehicle, mechanical, manual and fibre break) and Leak Detection System (LDS) for water pipeline applications.
Here is the list of few ongoing DAS projects:
No | Project Name | Client | Scope of Works | Cable installed (Km) | Period | fibre |
---|---|---|---|---|---|---|
1 | NEW ABHA METROPOLITAN CITY FEEDER WTS PHASE-2 PROJECT | SWCC (SSEM) | Distributed Acoustic Sensing (DAS) - DAS design, supply, installation & testing | 52km | Ongoing | 72f + 1 |
2 | Jubail Eastern Province Phase 3 WTS Project | SWCC (RTCC) | FOC Supply & Services, DAS design, supply, installation & testing | 127km | Ongoing | 72f + 3 |
3 | NEOM - 0000100120/108 - Highway 55 Detour and Water Transmission Pipeline | NEOM (AL SAYEGH) | FOC Supply & Services | 14km | Ongoing | 72f + 12f |
4 | Khobar to Hofuf (KH) WTS | SWCC (MGC) | FOC Supply & Services, DAS design, supply, installation & testing | 156km | Ongoing | 72f + 3 |
5 | Asfan RS to North Jeddah Reservoir Station (NJ) WTS | SWCC (MGC) | FOC Supply & Services, DAS design, supply, installation & testing | 24km | Ongoing | 72f + 1 |
6 | Rayis – Yanbu WTS | SWCC (MGC) | FOC Supply & Services, DAS design, supply, installation & testing | 46km | Ongoing | 72f + 1 |
7 | New Abha Metropolitan City Feeder Phase 1 WTS | SWCC (MGC) | FOC Supply & Services, DAS design, supply, installation & testing | 82km | Ongoing | 72f + 4 |
8 | Contract No: 6600045862 SGTP (South Ghawar UR-Transmission Pipelines) | ARAMCO (CAT) | FOC Services | 260km | Ongoing | 72f |
9 | Shuqaiq Phase 3 WTS | SWCC (RTCC) | FOC Supply & Services, DAS design, supply, installation & testing | 510km | Ongoing | 72f + 9 |
10 | Khobar to Dammam / Jamiah WTS | SWCC (SSEM) | DAS design, supply, installation & testing | 30km | Ongoing | 72f + 1 |
11 | Tofeih to Jubail WTS | SWCC (MGC) | FOC Supply & Services, DAS design, supply, installation & testing | 40km | Ongoing | 72f + 1 |