Project NameClientScope of WorksCable Laid (km)PeriodCable Size (fibre)
Aramco East – West Pipeline FO NetworkAramco / STESAHDD HDPE duct
F.O. cable installation, splicing & testing
40 Km (duct)May 07 - 09< 36
Shoaiba WTS
F.O. SCADA Network
SWCC / SSEM / RTCC / ABBF.O. SCADA Network
Cable Blowing, Splicing & Testing
Equipment installation
Maintenance for SWCC
300Feb 09 –
May 2012
24f
SWCC EPWTS Phase 2
Jubail
SWCC / SSEMHDD HDPE duct3 Km (duct)Oct 09 – Nov 09 HDD only
Ras Al Khair WTS
F.O. SCADA Network
SWCC / SSEMSupply & Installation
Cable Blowing, Splicing, Testing, Civil work (Riyadh)
500 Km2010 – ongoing72f
Huawei Installation Services Frame Contracts
GSM & Microwave
UMTS, 2G, 3G, 4G, LTE & SWAP
STC / Mobily / ZainMobile GSM
RBS & Microwave Survey, Installation, testing, CWO, integration, PAT, Swap minor civil works
GSM sitesSept 2011 – OngoingGSM 1500 sites / links
Taif to Al Baha
F.O. SCADA Network
SWCC / APPCOSupply & Installation
Cable Blowing, Splicing, Equipment installation, Testing, Civil works manholes
275Jan 2012 – Ongoing72f
Alcatel – Lucent
Installation Services Frame Contracts
GSM & Microwave, 2G, 3G, 4G, LTE & SWAP
STC / Mobily / AramcoMobile GSM
RBS & Microwave Survey, Installation, testing, CWO, integration, PAT & SWAP
GSM sitesNov 2012 – OngoingGSM
480 sites / links
Yanbu – Madina WTS Phase-3 FO SCADA NetworkSWCC / SINOPEC F.O. cable Survey & Design, cable blowing, splicing & testing works600March-2014 - Ongoing72f
Alcatel – Lucent
F.O. Installation Services Frame Contracts
Fibre testing
STCCD/PMD testing100+ links2015 – Ongoing4-6f

Abbreviations:-

HDD – Horizontal Directional Drilling
WLL – Wireless Local Loop
SRS – Subscriber Radio System
WTS – Water Transmission System
F.O. – Fibre Optic Cable
FTTH – Fibre To The Home